Do you own a non-residential building in the Netherlands with more than 20 parking spaces? Then you're now required to have at least one charging point. What if that’s not the case yet?

Since 2025, a clear obligation has been in place in the Netherlands: every non-residential building with more than 20 parking spaces must have at least one charging point for electric vehicles. This rule stems from the European EPBD directive and is set out in the Dutch Building Environment Decree (Bbl). The regulation aims to speed up the transition to electric driving and also applies to existing buildings.

Haven’t started installing charging points yet? Now is the time to act.

What needs to be arranged?
In addition to installing at least one charging point, more and more organisations are looking to expand. Demand for charging capacity is growing rapidly. The companies within the VDK Groep can help with:

  • advice on and installation of suitable charging solutions

  • integration into existing electrical systems

  • combinations with energy management or battery systems

This helps prevent overload and keeps your costs and capacity under control.

No charging point yet? Act fast.
The requirement is in place. But more importantly: demand is growing. Taking action now helps you avoid future bottlenecks and shows you're ready for sustainable mobility. Want to know what’s technically possible at your location? The companies within the VDK Groep are happy to advise.